Waste-to-Energy Policy Governance in Makassar City: An Analysis of Institutional Readiness

Authors

  • Muhammad Raihan Saleh Oddang State University of Makassar image/svg+xml Author
  • Nur Asyifa T Institut Teknologi dan Bisnis Maritim Balik Diwa image/svg+xml Author
  • Muh. Ikramullah Akmal Institut Teknologi dan Bisnis Maritim Balik Diwa image/svg+xml Author
  • Ibrahim Arda Institut Teknologi dan Bisnis Maritim Balik Diwa image/svg+xml Author

DOI:

https://doi.org/10.83835/w6gjbg09

Keywords:

Governance, Institutions, Makassar, Readiness, Waste-to-Energy

Abstract

The Indonesian government has promoted waste-to-energy as an answer to overloaded landfills, but a plant can only work if local institutions turn national mandates into coordinated and durable action. This article examines how ready Makassar City is to govern a waste-to-energy plant. Building on the collaborative governance framework and on the implementation barriers reported in the waste-to-energy literature, we analysed eleven official and media documents published between 2018 and 2026 and rated institutional readiness on seven dimensions: legal basis, intergovernmental coordination, financing and electricity purchase, site and land, upstream waste management, public legitimacy, and organizational capacity. Formal arrangements are the most mature part of the system. A cooperation agreement now binds the South Sulawesi provincial government, Makassar City, Gowa Regency, and Maros Regency, and the environment ministry coordinates the project directly. Readiness across the other dimensions is uneven. The planned plant of 1,000 tonnes per day would absorb about 61 percent of the 1,644 tonnes generated daily in the metropolitan area, leaving roughly 39 percent to source separation and landfill improvement, the two areas where progress is weakest. The financing scheme and the legal mechanism have changed several times, the site is still debated, and civil society objections to waste combustion remain unresolved. The documents offered no direct evidence on organizational capacity. We conclude that Makassar is held back less by missing rules than by weak upstream management, an unstable project design, and unsettled legitimacy. The article contributes a documented readiness profile that other cities in the national waste-to-energy program can adapt and test.

References

Ansell, C., & Gash, A. (2008). Collaborative governance in theory and practice. Journal of Public Administration Research and Theory, 18(4), 543–571. https://doi.org/10.1093/jopart/mum032

Antara. (n.d.). Tangani sampah, pemerintah investasi Rp3 triliun untuk PSEL Makassar. Antara News. https://www.antaranews.com/berita/5513113/tangani-sampah-pemerintah-investasi-rp3-triliun-untuk-psel-makassar

Bociaga, R. (2026, July 8). Indonesia's infrastructure trap: When grand plans outpace local reality. Asialink, University of Melbourne. https://asialink.unimelb.edu.au/diplomacy/insights/indonesias-infrastructure-trap-when-grand-plans-outpace-local-reality/

detikSulsel. (2023). DPRD Makassar minta DLH kaji ulang lokasi pembangunan proyek PSEL. detik.com. https://www.detik.com/sulsel/berita/d-6843092/dprd-makassar-minta-dlh-kaji-ulang-lokasi-pembangunan-proyek-psel

Iresha, F. M., Gutama, H., & Rizkianto, F. (2026). Pandangan era transisi pengelolaan sampah di Indonesia: Dari berbasis masyarakat menuju waste to energy. Jurnal Sains dan Teknologi Lingkungan, 18(2), 247–260. https://journal.uii.ac.id/JSTL/article/view/12597

JDIH Kemenko Infrastruktur. (n.d.). Peraturan Presiden Republik Indonesia No. 35 Tahun 2018 tentang Percepatan Pembangunan Instalasi Pengolah Sampah Menjadi Energi Listrik Berbasis Teknologi Ramah Lingkungan. https://jdih.kemenkoinfra.go.id/id/peraturan-presiden-republik-indonesia-no-35-tahun-2018

Kementerian Lingkungan Hidup. (2026a, April 4). Menteri LH percepat PSEL Makassar Raya, jawab darurat sampah dan jalankan instruksi presiden. https://www.kemenlh.go.id/news/detail/menteri-lh-percepat-psel-makassar-raya-jawab-darurat-sampah-dan-jalankan-instruksi-presiden

Kementerian Lingkungan Hidup. (2026b, August 6). Menteri LH pastikan percepatan proyek sampah jadi energi dan cegah kebakaran TPA di Makassar. https://www.kemenlh.go.id/news/detail/menteri-lh-pastikan-percepatan-proyek-sampah-jadi-energi-dan-cegah-kebakaran-tpa-di-makassar

Maddi, M. (2024). Balancing acts: Unveiling socio-economic and environmental dimensions of waste-to-energy policies in Indonesia. Dialogue: Jurnal Ilmu Administrasi Publik, 6(1), 683–695. https://doi.org/10.14710/dialogue.v6.i1.22388

Metro TV. (2026). Zulhas dukung PSEL dipusatkan di TPA Antang Makassar. Metrotvnews.com. https://www.metrotvnews.com/read/kj2CD7OJ-zulhas-dukung-psel-dipusatkan-di-tpa-antang-makassar

Nur Asyifa, T. (2023). Implementation program for complete systemic land registration (PTSL) for acceleration of land registration at Makassar Land Office. Jurnal Aktor, 4(1). https://doi.org/10.26858/aktor.v4i1.68302

Nur Asyifa, T., Aslinda, A., & Herman, H. (2025). Collaborative governance in green open space management in Makassar City. International Journal of Public Policy and Bureaucracy, 2(1), 67–87. https://journal.unm.ac.id/index.php/IJOPAB/article/view/6668

Nurfaisah, A. S. (2024, September 24). Proyek PSEL Makassar senilai Rp 3,1 triliun groundbreaking akhir 2024. detikSulsel. https://www.detik.com/sulsel/makassar/d-7556458/proyek-psel-makassar-senilai-rp-3-1-triliun-groundbreaking-akhir-2024

RRI. (n.d.-a). Munafri: Pembenahan TPA Tamangapa capai 93 persen. RRI.co.id. https://rri.co.id/makassar/asta-cita/2626820/munafri-pembenahan-tpa-tamangapa-capai-93-persen

RRI. (n.d.-b). Pemkot Makassar pastikan proyek PSEL tetap berjalan, lokasi masih dibahas. RRI.co.id. https://rri.co.id/makassar/asta-cita/2632214/pemkot-makassar-pastikan-proyek-psel-tetap-berjalan-lokasi-masih-dibahas

RRI. (2026, April 5). Pemerintah percepat bangun PSEL Makassar Raya, untuk jawab darurat sampah. RRI.co.id. https://rri.co.id/nasional/2311803/pemerintah-percepat-bangun-psel-makassar-raya-untuk-jawab-darurat-sampah

Sekretariat Kabinet Republik Indonesia. (2018). Presiden teken Perpres percepatan pembangunan instalasi pengolah sampah menjadi energi listrik. https://setkab.go.id/presiden-teken-perpres-percepatan-pembangunan-instalasi-pengolah-sampah-menjadi-energi-listrik/

Tampubolon, A. F., Dharmawan, A. H., & Nuva. (2025). Peluang dan tantangan Pembangkit Listrik Tenaga Sampah (PLTSa) Bantargebang dalam prinsip ekonomi sirkular. Jurnal Risalah Kebijakan Pertanian dan Lingkungan, 12(2), 175–181. https://journal.ipb.ac.id/jkebijakan/article/download/65768/31402/359912

Downloads

Published

2026-11-01

Issue

Section

Articles

How to Cite

Waste-to-Energy Policy Governance in Makassar City: An Analysis of Institutional Readiness. (2026). Interdisciplinary Policy and Management, 1(3), 28-40. https://doi.org/10.83835/w6gjbg09

Most read articles by the same author(s)

Similar Articles

You may also start an advanced similarity search for this article.